Home > Conservatories > Conservatory Piling

PILING A CONSERVATORY

The Coral Windows guide to piling a Conservatory

This short guide shows the work Coral Windows & Conservatories carry out to correctly pile a conservatory.

1. The area is carefully prepared before the construction work starts. 2. Piling tubes are positioned, ready to receive the piling machine.
3. Here you see the piling machine in the tube ready to start its work. 4. As the tubes descend into the earth they are welded together.
5. After the piles have been inserted they are cut to size. 6. The piles are now filled with concrete.
7. The ring beam is constructed on site to meet the individual requirement of the customers Conservatory. 8. Here you see high quality steel waiting to be made into a ring beam
9. Once the ring beam has been completed it can be lowered into place. 10. Concrete is now laid over the completed job .
11. All is now ready for the conservatory to be built on a firm foundation.

If you have any questions with regards to pilling, one of our qualified surveyors would be pleased to assist you.